Architect, Art & Artists, Business, Real Estate, Technology

How Building Information Modeling Works

Photo of author

By Kaleem Ullah

Architects can use cutting-edge technology known as Building Information Modeling (BIM) to provide their clients with better designs. It also helps them visualize the project as a whole, reducing the possibility of misunderstandings or miscommunications. However, there are some risks associated with utilizing BIM.

BIM Levels

The term BIM levels refer to industry standard definitions of different levels of Building Information Modelling. These levels represent various industry criteria and help stakeholders understand where they stand in construction.

Each level has its own requirements and measurable indicators. For example, a level one project will require using a Common Data Environment. This is an online repository where project data is hosted.

A BIM Level 2 project will require a Master Information Delivery Plan. This plan will outline the roles and responsibilities of each participant in the project. It also defines how information is shared.

A BIM Level 3 project will allow all participants to work on a single project model. This model is hosted in a central database. All of the participants can make modifications to the model and share it in real-time.

Creating a complete digitalization strategy is something that takes time to be achieved. You will need to identify the right software partner, train staff and establish processes. But once you’ve laid the groundwork, you’ll be well on your way to fully integrating all of the data and procedures associated with your project.

A Common Data Environment will help you share data and documents electronically. You can then easily collaborate with other stakeholders. Implementing and adopting BIM comes with several technical challenges that organizations must overcome. These changes to business and operational procedures are facilitated by bim miami services.

BIM Data Ownership is a Risk

BIM, or building information modeling, is a new technology growing in popularity. It is an electronic platform that can be used for estimating, construction, maintenance, and more. However, it comes with a set of risks. Those risks include data ownership, technical problems, and contractual disputes. These risks can be mitigated by careful project planning and management.

In the end, a robust security system is the best way to safeguard the integrity of your data. This should be addressed before the project begins.

Other risk mitigations include clearly drafted contracts and implementing appropriate security measures within the project. Contractors with a good handle on the complexities of the new technology should be able to manage the changing risks.

Another risk that should be addressed is the use of collaborative platforms. Collaborative platforms allow for the sharing and integration of data. But it also introduces the risks of unauthorized access, resulting in a free flow of information.

Attributing the BIM model to the project’s owner is a complex matter. It will depend on the project size and how many stakeholders will be involved. As such, it is essential to identify which parties have a vested interest in the data.

For example, some specialty contractors may be vested in the design. Consequently, they may want to retain their rights to the data after the project is completed.

BIM Can Help Architects Make Better Design Choices

Building Information Modeling (BIM) is a design tool that allows architects and engineers to create precise 3D models of structures. This information can be shared among the design team and used for various downstream processes.

Costs and risks are decreased thanks to BIM. It improves productivity and enables better design, construction, and operations coordination. It offers a better perspective of the design before the start of construction.

Recent BIM technology projects have produced excellent results. The project enhanced communication between the owner and the project team. Miscalculations were also less likely as a result. The project saved more than $124,500 by using the technology to avoid unforeseen expenses.

In the early stages of the project, architects and contractors would share digital models. However, these documents often needed to be more accurate. They could generate more precise and detailed layouts using BIM software. These deliverables were used for accurate material quantity takeoffs, which reduced rework.

BIM allows architects to quickly create design prototypes and adjust the design to fit the client’s needs. The client can then approve the procedure faster.

Building data includes information about the structure’s functional qualities and other documentation. The data can be integrated with lifecycle data for facilities management. This information can also be used to manage operations after handover.